|
|
| Combined General Section (476kb pdf) |
|
| |
|
|
| GEN-1 |
Introduction (252 kb pdf) |
|
| GEN-2 |
Strategic Alignment (263kb pdf) |
|
| GEN-3 |
Levels of Service (246kb pdf) |
|
| GEN-4 |
Definitions (355kb pdf) |
|
| GEN-5 |
Document Control and Management (260kb pdf) |
|
|
| ID-1 |
Infrastructure Development Processes (304kb pdf) |
|
|
| Combined Business and Process Diagrams Section (613kb pdf) |
| |
|
|
| PD-1 |
Subdivision Consent Process (Under Construction) |
|
| PD-2 |
s224(c) Process (Under Construction) |
|
| PD-3 |
Development Works Approval Process (270kb pdf) |
| PD-4 |
Procedure to Amend Development Works (274kb pdf) |
|
|
|
| Combined Design Standards Section (3.4mb pdf) |
| |
|
|
| DS-1 |
General Provisions (928kb pdf) |
|
| DS-2 |
Streetscape (289kb pdf) |
|
| DS-3 |
Reserves (292kb pdf) |
|
| DS-4 |
Transportation Network (803kb pdf) |
|
| DS-5 |
Stormwater (580kb pdf) |
|
| DS-6 |
Wastewater (381kb pdf) |
|
| DS-7 |
Water Supply (530kb pdf) |
|
| DS-8 |
Public Lighting (262kb pdf) |
|
| DS-9 |
Network Utilities (256kb pdf) |
|
| DS-10 |
Natural Hazards and Earthworks (466kb pdf) |
| DS-11 |
Road Zone Occupancy (971kb pdf) |
|
|
|
| Combined Construction Standards Section (1.5mb pdf) |
| |
|
|
| CS-1 |
General Provisions (10mb pdf) |
|
| CS-2 |
Streetscape (279kb pdf) |
|
| CS-3 |
Reserves (238kb pdf) |
|
| CS-4 |
Transportation Network (351kb pdf) |
|
| CS-5/6 |
Stormwater & Wastewater (Combined) (351kb pdf) |
| CS-7 |
Water Supply (278kb pdf) |
|
| CS-8 |
Public Lighting (262kb pdf) |
|
| CS-9 |
Network Utilities (239kb pdf) |
|
| CS-10 |
Natural Hazards and Earthworks (315kb pdf) |
| CS-11 |
Road Zone Occupancy (183kb pdf) |
|
|
|
| Combined Approved Materials Section (749kb pdf) |
|
| |
|
|
| AM-1 |
General Provisions (284kb pdf) |
|
| AM-CBD |
Central Business District (251kb pdf) |
|
| AM-2 |
Streetscape (244kb pdf) |
|
| AM-3 |
Reserves (250kb pdf) |
|
| AM-4 |
Transportation Network (286kb pdf) |
|
| AM-5 |
Stormwater (288kb pdf) |
|
| AM-6 |
Wastewater (313kb pdf) |
|
| AM-7 |
Water Supply (305kb pdf) |
|
| AM-8 |
Public Lighting (246kb pdf) |
|
| AM-9 |
Network Utilities (233kb pdf) |
|
|
|
| Combined Inspection and Testing Requirements Section (8581kb pdf) |
| |
|
|
| IT-1 |
General Provisions (411kb pdf) |
|
| IT-2 |
Streetscape (668kb pdf) |
|
| |
|
IS2.1 Inspection Sheet - Tree (201kb pdf) |
| IT-3 |
Reserves (668kb pdf) |
|
| |
|
S2.1 Inspection Sheet - Tree (201kb pdf)
(NB this is the same form as above)
|
| IT-4 |
Transportation Network (1.2mb pdf) |
|
| |
|
IS4.1 Inspection Sheet - Vehicle Crossing (120kb pdf) |
| |
|
IS4.2 Inspection Sheet - Pre-Seal (215kb pdf) |
| IT-5 |
Stormwater (1.1mb pdf) |
|
| |
|
IS5.1 Inspection Sheet - Stormwater Manhole & Pipeline <50m Length (357kb pdf) |
| |
|
IS5.2 Inspection Sheet - Sump (301kb pdf) |
| IT-6 |
Wastewater (3.1mb pdf) |
|
| |
|
IS6.1 Inspection Sheet - Stormwater Manhole & Pipeline <50m Length (434kb pdf) |
| |
|
TS6.1 Wastewater Low Pressure Air Test (236kb pdf) |
| |
|
TS6.2 Wastewater High Pressure Air Test (236kb pdf) |
| |
|
TS6.3 Wastewater Rising Main Pressure Test (311kb pdf) |
| |
|
TS6.4 Manhole Infiltration Test (235kb pdf) |
| IT-7 |
Water Supply (3mb pdf) |
|
| |
|
IS7.1 Inspection Sheet - Hydrant (142kb pdf) |
| |
|
IS7.2 Inspection Sheet - Valve (129kb pdf) |
| |
|
IS7.3 Inspection Sheet - Water Connection (202kb pdf) |
| |
|
TS7.1 Water Supply Pressure Testing 306kb pdf) |
| |
|
TS7.2 Installation Disinfection (243kb pdf) |
| IT-8 |
Public Lighting (185kb pdf) |
|
| IT-9 |
Network Utilities (185kb pdf) |
|
|
|
| SD1 |
General Provisions (420kb pdf) |
|
| |
|
T100 - Perspective Drawings |
| |
|
CBD - Series Drawings |
| |
|
T200 - Streetscape |
| |
|
T300 - Reserves |
| |
|
T400 - Transportation Network |
| |
|
T500 - Stormwater |
| |
|
T600 - Wastewater |
| |
|
T700 - Water Supply |
| |
|
T800 - Public Lighting (120kb pdf) |
| |
|
As Built Drawings |
|
|
| Combined Quality Assurance Requirements Section (815kb pdf) |
| |
|
|
| QA-1 |
Information Requirements (240kb pdf) |
| QA-2 |
Development Evaluation Reports (280kb pdf) |
| QA-3 |
Development Works Approval (295kb pdf) |
| QA-4 |
Quality Assurance Record (Completion) (276kb pdf) |
| QA-5 |
As-Built Information (339kb pdf) |
|
| QA-6 |
Digital Data Transfer Standard (484kb pdf) |
| QA-7 |
Council Supplied Electronic Data (239kb pdf) |
|
|
| Combined Checklist and Certification Section (3.8mb pdf) |
| |
|
| AC-1 |
Application Checklist - Development Evaluation Report (222kb pdf) |
| G1 |
Producer Statement - Suitability of Land For Subdivision (217kb pdf) |
| C1 |
Producer Statement - Design (235kb pdf) |
| AC-2 |
DWA and As-Built Submission - Infill (1 of 2) (226kb pdf) |
| AC-2 |
DWA and As-Built Submission - Infill (2 of 2) (223kb pdf) |
| AC-3 |
DWA and As-Built Submission - General - All Drawings (222kb pdf) |
| AC3.1 |
DWA and As-Built Submission - Reserves (221kb pdf) |
| AC3.2 |
DWA and As-Built Submission - Transportation/Streetscape (1 of 2) (222kb pdf) |
| AC3.2 |
DWA and As-Built Submission - Transportation/Streetscape (2 of 2) (223kb pdf) |
| AC3.3 |
DWA and As-Built Submission - Stormwater (225kb pdf) |
| AC3.4 |
DWA and As-Built Submission - Wastewater (224kb pdf) |
| AC3.5 |
DWA and As-Built Submission - Water Supply (223kb pdf) |
| AC3.6 |
DWA and As-Built Submission - Natural Hazards and Earthworks (223kb pdf) |
| CM-1 |
Construction Monitoring Services (279kb pdf) |
| AC-4 |
Application Checklist - Development Completion Report (226kb pdf) |
| G2 |
Producer Statement - Suitability Of Land For Building Development (217kb pdf) |
| C2 |
Streetscape Construction Certification (226kb pdf) |
| C3 |
Reserves Construction Certification (226kb pdf) |
| C4 |
Transportation Construction Certification (221kb pdf) |
| C5 |
Stormwater Construction Certification (230kb pdf) |
| C6 |
Wastewater Construction Certification (230kb pdf) |
| C7 |
Water Construction Certification (234kb pdf) |
| C9 |
Network Utilities Certification 203kb pdf) |
| G3 |
Summary of Geotechnical Data for Individual Lots (137kb pdf) |
| G4 |
Geotechnical Checklist - Geotechnical Reporting (264kb pdf) |
| C10 |
Producer Statement - Completed Construction Works (237kb pdf) |
| AC-5 |
Application Checklist - 224 Application (224kb pdf) |
| AR-1 |
Infrastructure Asset Register (221kb pdf) |
| B1 |
Streetscape / Reserves Bond Form (225kb pdf) |
| B2 |
Streetscape / Reserves Bond Calculation (Under Construction) |
|
|
| IDC Cover (3mb pdf) |
| IDC Spine (411kb pdf) |
| General Tab (2.9mb pdf) |
| Infrastructure Development Process Tab (1.39mb pdf) |
| Business and Process Designs Tab (172 kb pdf) |
| Design Standards Tab (502kb pdf) |
| Construction Standards Tab (518 kb pdf) |
| Approved Materials Tab (611kb pdf) |
| Inspection and Testing Requirements Tab (814kb pdf) |
| Standard Drawings Tab (528 kb pdf) |
| Quality Assurance Requirements Tab (446kb pdf) |
| Standard Checklists and Certification Forms Tab (314kb pdf) |